After completing the foundation works, permission was obtained from the municipality to connect the building to the main water supply line. The location of the existing main water line was identified, and excavation was carried out carefully using an excavator.
Once the main line was exposed, a branch connection was made to supply water to the building. A service pipe was extended from the main line to the building entrance, and a water meter was installed at the designated location in accordance with municipal regulations.
After the installation and necessary checks were completed, the trench was backfilled with high-strength gravel to provide proper compaction, pipe protection, and drainage. The surface was then leveled to restore the area.
Temel çalışmalarıTamamlandıktan sonra, binanın ana su şebekesine bağlanması için belediyeden izin alındı. Mevcut ana su hattının yeri tespit edildi ve ekskavatör kullanılarak dikkatlice kazı yapıldı.
Ana hat ortaya çıkarıldıktan sonra, binaya su sağlamak için bir branşman bağlantısı yapıldı. Ana hattan bina girişine bir servis borusu uzatıldı ve belediye yönetmeliklerine uygun olarak belirlenen yere bir su sayacı takıldı.
Kurulum ve gerekli kontroller tamamlandıktan sonra, uygun sıkıştırma, boru koruması ve drenaj sağlamak için hendek yüksek mukavemetli çakıl ile dolduruldu. Daha sonra alan eski haline getirilmek üzere yüzey düzeltildi.