After reviewing the mechanical installation project, the locations of the indoor and outdoor units were determined. The under-ceiling pipe route was planned, and potential clashes with other mechanical and electrical lines were checked. Pipe support and mounting points were identified in advance.
When the refrigerant copper pipes arrived on site, their diameters were verified according to the project specifications. The pipes were then cut to the required lengths. After cutting, burrs were removed using a reaming tool to ensure a smooth internal surface and prevent damage to the system.
The liquid and gas lines were installed separately and mounted to the ceiling using appropriate brackets and hangers. Care was taken to maintain proper bending radii and alignment. After installation, the pipes were covered with elastomeric rubber insulation to prevent heat loss and condensation. Finally, all insulation joints were tightly wrapped with insulation tape to ensure continuity and airtightness.
Mekanik tesisat projesi incelendikten sonra, iç ve dış ünitelerin yerleri belirlendi. Tavan altı boru güzergahı planlandı ve diğer mekanik ve elektrik hatlarıyla olası çakışmalar kontrol edildi. Boru destek ve montaj noktaları önceden belirlendi.
Soğutucu bakır borular sahaya ulaştığında, çapları proje özelliklerine göre doğrulandı. Daha sonra borular gerekli uzunluklara kesildi. Kesimden sonra, iç yüzeyin düzgün olmasını sağlamak ve sisteme zarar vermeyi önlemek için çapaklar bir rayba aleti kullanılarak temizlendi.
Sıvı ve gaz hatları ayrı ayrı monte edildi ve uygun braketler ve askılar kullanılarak tavana monte edildi. Doğru bükme yarıçaplarının ve hizalamanın korunmasına özen gösterildi. Montajdan sonra, ısı kaybını ve yoğuşmayı önlemek için borular elastik kauçuk izolasyonla kaplandı. Son olarak, sürekliliği ve hava geçirmezliği sağlamak için tüm izolasyon bağlantıları izolasyon bandıyla sıkıca sarıldı.